Modification works at Mandai Depot (MDD) in total of three phases. This involved 400mmsq cable to be replaced and diverted at trackside. Inclusive of running rail drilling of 19mm and 22mm for cable/lug termination and mega testing for connectivity.
We’re ready when you are.