Project Reference

S/No

Details of Contract Executed

Client Reference
and Contact Nos.
Date of Completion
1 Provision of services for operation of Works Train for Thomson-East Coast Line Stage 1,2, & 3, Gali Batu Depot Extension And Tuas Depot Extension Land Transport Authority

01 December 2020

2 Manpower Supply Services for Trackwork Activities At TSA Depot, Stations And Tunnels of T250 Trackwork Thomson Line Project In Singapore CTCI Singapore Pte Ltd 31 August 2019
3 Power Supply Upgrading for North South East West Line - High Voltage (HV) Power System And Associated Equipment Meiden Singapore Pte Ltd On going project
4 T250A - Trackworks for Thomson-East Coast Line Stage 4 & 5, Downtown Line Stage 3 Extension And East-West Line Upgrade Provision of Manpower Supply Service for Microstation Cad Drafter China Railway First Group Co., Ltd Term Contract
5 To supply and deliver Insulated Rail Join (IRJ) with Rails (Premium & Standard). SBS Transit Ltd – Rail Business 01 June 2018
6 Provision of 06 skilled workers (per work team/job, qualified Thermit Welder ) for PWAY works in DTL Tunnel SBS Transit Ltd – Rail Business 31 December 2018
7 To Supply labour, transport, equipment/machinery and everything else necessary for replacement of existing signal/ground expansion joints in BPLRT guideways SMRT Trains Ltd 30 April 2018
8 Replacement of existing power expansion joints in c/w jumper cable for system-wide in BPLRT network. SMRT Trains Ltd 11 Jan 2018
9 Supply (01) one supervisor and (03) three general workers for rail maintenance activities SBS Transit Ltd Term Contract
10 QX15-012 SMRT Project – Supply of Labour for NSL 3rd Rail Installation Alstom Transport (S) Pte Ltd 31 December 2017
11 Supply of labour and the provision of services for Trackwork Installation, TSA Logistics Support and Technical Services for Downtown line (DTL 1 & 2) Alstom Transport (S) Pte Ltd 31 July 2017
12 Supply of Tamping Machine with Operating Crew Including Consumables and Daily Preventive Maintenance for the East West Line Track System Replacement Gammon Pte Ltd 30 June 2017
13 Supply of labour and the provision of services for Trackwork Installation, TSA Logistics Support and Technical Services for Singapore Trackwork for Tuas West Extension (TWE) Alstom Transport (S) Pte Ltd 31 Mar 2017
14 Supply of Technicians (Mechanical or Electrical Background) & Storeman cum Drivers Bombardier (Singapore) Pte Ltd Term Contract
15 Supply and Delivery of Creosote Treated Timber Beares/Sleepers Balfour Beatty – Gammon Joint Venture 31 December 2016
16 Supply of Labour and The Provision of Services for Trackwork Installation, Tsa Logistics Support and Technical Services for DTL3, including but not limited to Trackbed & Walkway Concreting CTCI Singapore Pte Ltd 30 December 2016
17 Supply of labour and the provision of services for Trackwork Installation, TSA Logistics Support and Technical Services for Downtown line (DTL 1) Alstom Transport (S) Pte Ltd 31 March 2015
18 Supply of Labour, material plant/Equipment for PWY and ETB Maintenance Works SMRT Trains (S) Ltd 30 December 2014
19 Singapore LNG Terminal Project - Supply of Labour and the provision of Services for supervising skilled and un skilled labour at site (Electrical work) Samsung C & T Corporation 28 February 2014
20 Design & Constructon of Tunnnels between stations at Beauty World and Hill view for Downtown Line (DTL 2) S K Engineering & Construction 30 August 2013
21 Supply of Labour and the Provision of Services Multibase Construction Pte Ltd 31 March 2013
22 Pipe Line Work for Tunnel Boreing Machine for Downtown Line Stage 3 Sato Kogyo (S) Pte Ltd 31 August 2012
23 Supply of labour and the provision of services for Trackwork Installation, TSA Logistics Support and Technical Services for Sengkang North-East Line (NEL) Depot Alstom Transport (S) Pte Ltd 30 December 2011
24 Carlton Hotel Project – Supply of Labour, Materials and the Provision of Services for the Construction of RC Wall Kajima Overseas Asia Pte Ltd 30 December 2011
25 Supply of labour and the provision of services for Trackwork Installation for Circle Line Extention (CLE) Alstom Transport (S) Pte Ltd 30 October 2011
26 Supply of TW and Logistics Support Services Specialised Trades Alstom Transport (S) Pte Ltd 31 July 2011
27 Supply of Labour and provision of services for Trackwork Installation for CCL1, CCL2,CCL3,CCL4 & CCL5 Alstom Transport (S) Pte Ltd 31 July 2011
28 Supply of Labour, Material and the provision of Services for the Construction of Temporary Staging Area at CCL Stage 4/5 Bukit Brown Station Alstom Transport (S) Pte Ltd 30 August 2007
29 Supply of Labour, Material and the provision of Services for the Construction of Temporary Staging Area at CCL Stage 4/5 North Buona Vista Road Alstom Transport (S) Pte Ltd 30 September 2007